Year Of The WorkingClient NameJOB DescriptioJob name
2009Samsung EngineeringCatalyst LoadingGSP 6 Project
2009CTCI ConstructionInternal Tray and Cooling part InstallationPTT Asahe Project
2010Doosan Heavy Industry ConstructionManpower Supply for Grantee PlantGlow Generation Group
2010-2011Oualitech Engineering ConstructionInternal tray InstallationIRPC TGTU-1 ARU-2 Project
2010-2011SK/ Thai Woo Ree EngineeringInternal tray Reactor InstallationPTT GC 1 Clean Fuel Project
2011Viny Thai Public Co.,Ltd.Modify Tray and InstallationShut Down Unit VCM Plant
2012Thai Woo Ree EngineeringInternal Tray InstallationBST LATEX Plant Project
2012PTT Public Co.,Ltd.Air Fin Cooler CleaningShut Down ESP Plant
2012-2013BST Elastomer Co.,LtdChemical Warehouse Demolish and ConstructionBST Elastomer Plant
2013KEC.Kong Patana Co.,LtdRoller reactor supportShut Down HMC PDH Plant
2013Nippon Express Co.,LtdInternal Tray InstallationPTT GC/BV Project
2013Mega Bangna Co.,LtdWet Scrubber Design and InstallationRevampWaste Water Plant
2013Blue Scope Co.,LtdRolling Coil Car and Chemical Pump Maintenance ServiceTurn Around Plant Cool mill
2013PTT Public Co.,LtdAir Fin Cooler Pressure Jet CleaningESP. Shut Down Unit
2013Mega BangnaOverhaul Blower and DustShut Down Unit Building
2013HMC Polymer Co.,Ltd.Spray Bio Mediation Agent Control Smell Hydrocarbon form Production ProcessTurn Around PHD Plant
2013Mega Bangna Co.,Ltd.Overhaul Pump and Upgrade Impeller Form Carbon to SS304Waste Water Treatment Plant Shut Down
2014Vatana Phaisal EngineeringEquipment installation , Compressors , Pump , Air Fin Cooler , Overhead Crane ,UHV Project
2014Vatana Phaisal EngineeringManpower SupplyUHV Project
2014SK EngineeringMaintenance ServiceMaintenance Service
2014GS Engineering and ConstructionMaintenance ServiceMaintenance Service
2014PTT ME Company LimitedImprove storage tank and modify nozzleIRPC petroleum
20143K Transport EngineeringSteel structure Fabrication InstallationIRPC Plc.
2014Vatana Phaisal EngineeringEquipment installation , Compressors , Pump , Air Fin Cooler , Overhead Crane ,UHV Project
2014Vatana Phaisal EngineeringManpower SupplyUHV Project
2014Blue Scope Co.,LtdMaintenance ServiceMaintenance Service
2014Evonik thai aerosil Co.,Ltd.Repair Pump Sum pitMaintenance Service
2015PTT Maintenance and Engineering Company LimitedPump Compressor Internal tray Installation workAROMATICS – II DEBOTTLE NECKING PROJECT (PTTGC)
2015PTT Public Co.,LtdAir Fin Cooler Pressure Jet CleaningGSP6 Unit
2015PTT Maintenance and Engineering Company LimitedTurnaround / Shutdown Work for Demolish Existing Tray, Replace/ Installation New TrayAROMATICS – II DE bottle neck PROJECT (PTTGC)
2015GS Engineering Construction Company LimitedGeneral Local Fabrication workUHV Project
2015PTT Maintenance and Engineering Company LimitedManpower Supply (Mechanical / Piping work)AROMATICS – II Shutdown PROJECT (PTTGC)
2015GS Engineering Construction Company LimitedGeneral Local Fabrication workUHV Project
2015Blue Scope Co.,LtdMaintenance ServiceMaintenance Service
2015Vatana Phaisal EngineeringInstall Insulation support ring 52R001 A/B, 52R002, 52R003, 52D002UHV Project
2016Asia refining Co.,Ltd.Renovated and new fabricate distillation tank, Piping workProcess Expansion
2016Innovek Asia ThailangRemove and installation Cooling TowerSCG Site 2
2017PTT Maintenance and Engineering Company LimitedRelocate and Renovated Lpg Pipe lineNPC – SE
2017PTT Maintenance and Engineering Company LimitedRelocate and Renovated Steam pump alignment workPTT GC (i4)
2017PTT Maintenance and Engineering Company LimitedClear punch listANNAPURNA PROJECT
2017-2018THAI MADEN SHA THAILANDINSTALLATION EQUIPMENT AND STRUCTUREGALAXY PROJECT NS-BLUESCOPE MCL3
2018Asia refining Co., Ltd.PROCESS PIPE FABRICATERENOVATE LINE AND OVERHUAL PUMP
2019GC Maintenance and Engineering Company LimitedShut down Clean and Remove internal tray with loading packingGC Glycol shut down plant
2019GC Maintenance and Engineering Company LimitedShut down Clean and Remove internal tray with loading packingGC Glycol shut down plant
2019GGC Global Green ChemicalClean Remove Internal Tray and InstallationGGC Mini Shut down 2019
2019SCG Thai Plastic ChemicalClean Remove Internal Tray and Installation High Pressure Jet CleaningVCM1 Plant Turn Around
2019GC Maintenance and Engineering Company LimitedShut down Modification Pump Base PlateGC 6 Shut Down 2019
2019GC Maintenance and Engineering Company LimitedModification Pipe line Remove and Install Eye Shower Change Valve modify pipe lineGC 7
2020GC Maintenance and Engineering Company LimitedShut down Clean and Remove internal tray with loading packingGGC shut down plant
2019-2020CAZ (THAILAND) PUBLIC CO.,LTD.Pressure Vessel Internal tray installationGC ORP PROJECT
2020GC Maintenance and Engineering Company LimitedManpower supplyGGC Mini Shut down
2020GC Maintenance and Engineering Company LimitedManpower supplyGGC Mini Shut down
2021CAZ (THAILAND) PUBLIC CO.,LTD.Internal tray installationPTT LNG PROJECT
2021Thai Oil Public Co.Ltd.Repair and installation Spring HangerMaintenance project
2022Red Sea Engineering Company LimitedReactor internal part and column internal tray InstallationThai Oil CFP Project
2022CAZ (THAILAND) PUBLIC CO.,LTD.Internal tray installationGC OMP PROJECT
2022GC Maintenance and Engineering Company LimitedTA/ 2022 Column cleaning High Pressure Jet Cleaning Internal tray remove clean ,revamp , installationGC6 Turn around Shut down 2022
2022Thai Oil Public Co.Ltd.Fabrication Chemical Mobile tank And Trailer TruckChemical Truck project
2023Thai Oil Public Co.Ltd.Fabrication and installation Magnetic Level Sight GlassMaintenance project
2023GC Maintenance and Engineering Company LimitedColumn Internal Tray Replacement installationOIP Project
2023GC Maintenance and Engineering Company LimitedPipe fabrication and InstallationGC 2 Maintenance
2023Thai Scandic Steel Company LimitedOmega Purlin and Side Wall Installation Structure installationFifth Transmission Pipe Line PTT Project
2023J&M Engineering Company LimitedAHU Unit InstillationRobert Bosch Automotive Technologies (Thailand)